In June of 2016, Digitrol installed a new 1,300 ton Marley Cooling Tower, Trane Centravac Chiller, Patterson Vertical Inline, Rigid Coupled Condenser and Primary Chilled Water Pumps and a National Vertical Turbine Pump. This was a retrofit project for an existing chilled water system that was originally installed as a primary only system. The owner wanted to convert the system to a primary/secondary system so a new header had to be fabricated to decouple the chiller from the secondary piping loop.
The new system provides accurate chilled water supply temperatures with optimum system performance.
Date Completed: June, 2016
Location: McAdenville, NC
Application: Industrial Manufacturing
Equipment:
1,300 Ton Cooling Tower
1,300 Ton Chiller
Vertical Inline Pumps
Vertical Turbine Pumps
Driving Factors: More Efficient Operation
Click here for printable PDF